Plan for the establishment of investment projects and infrastructure in 2014 was formed by a slightly different manner, in contrast to the Plan in 2013. It is formed by 8-axis growth, dedicated to the investment strategy of the Republic of Buryatia in the period up to 2020, and includes 91 carryover from 2013 to infrastructure and 31 investment project.

In 2014, the Republic of Buryatia in the Plan are proposed to implement 50 investment projects worth about 242.7 billion. Rubles. With the volume of investment in 2014, more than 13 billion. Rubles.

For the implementation of the above projects will be the construction of an infrastructure facility 183, including 64 objects of transport, 60 social facilities, 25 of the engineering infrastructure, 3 power facility, 22 community facilities, 7 water conservancy facilities and environmental protection, and 2 objects for security with total funding in 2014 about 8.9 billion. rubles.

 

№№ 
p / p

Investment Zone

 

The total cost of the projects, mln. Rub.

Number of projects

Funding in 2014, mln. Rub.

The effect of the implementation of

Annual contribution to the GRP, mln. Rub.

Number of new jobs

Annual tax payments, mln. Rub.

1.

along the Trans-Siberian Railway: from west to east of the republic(Kabansky, Ivolginsky, Zaigraevsky Areas)

Investment projects, including:

16235.40

10

1518.50

5284.9

6444

5636.2

In 2014, in the "growth axis" along the Trans-Siberian railway is planned to implement 10 investment projects worth 16,235,400,000. Rub. (Including the 2014 1518500000. Rub.). GRP growth from these projects will be 5,284,900,000. Rub., Will create 6444 new jobs, annual tax revenue will amount to 5,636,200,000. Rub. For the implementation of the above projects will be built 40 infrastructure (including 11 objects of transport, 7 and 4 of the social engineering infrastructure object, object 3 Energy 13 -electricity and 2 - Water Resources) with total funding in 2014 1199770000 . rub.

Existing enterprises

11065.40

7

1457.50

1868.9

4487

355.3

The planned implementation of investment projects (site)

5170.00

3

61.00

3416

1957

5280.9

Infrastructure, including:

3269.37

40

1366.47

     

Transport infrastructure

333.54

11

223.84

To provide rural communities year-round links with a network of paved roads will be built 4.5 km and 11 km of roads reconstructed, renovated 2 bridge length of 21.8 lm, built two kindergartens with 250 seats and boarding school hall kettlebell sport, completed reconstruction of the building for the branch of the MFC will be built power supply facilities and supporting infrastructure TRC "Podlemorye" and ATK "Baikal", power supply of land for housing, held bank stabilization and reconstruction of 2-irrigation systems.

Social infrastructure

430.26

7

97.19

Electric Power

278,05

3

287,19

Utilities

1887.93

13

573.54

Water management and environmental protection

312.32

2

157.44

Engineeringinfrasturktura

27.27

4

27.27

TOTAL

19504.77

50

2884.97

     

2.

along the BAM in the north from the west to the east (Muya and North-Baikal regions)

Investment projects, including:

14351.50

3

1432.00

10703.3

599

183.1

In 2014, in the "growth axis" along the BAM planned for implementation 3 investment projects, worth $ 14,351,500,000. Rub. (Including the 2014 1432.0 million. Rub.). Contribution to GRP from these projects will be 10,703,300,000. Rub., Will create 599 new jobs, the annual tax amount postupelniya 183,100,000. Rub. For the implementation of the above projects will be built 23 of the infrastructure (including 13 of the transport, social object 5, 3 objects of engineering infrastructure and utilities hozhyaystva 2 objects) with total funding in 2014 397 840 000. Rub.

Existing enterprises

14351.50

3

1432.00

10703.3

599

183.1

Infrastructure, including:

480.41

23

397.84

     

Transport infrastructure

348.23

13

164.89

It is planned to construct and reconstruct 3 7 bridges and bridges, build 8.54 km of roads, build one school for 275 seats, 2 kindergartens with 260 seats, one of the sports hall at the school, the building branch under MFC, build networks for heating of land for housing, air transmission line engineering infrastructure for schools, water wells.

Social infrastructure

119.36

5

220.12

Engineering infrastructure

9.74

3

9.74

Utilities

3.08

2

3.08

TOTAL

14831.91

26

1829.84

     

3.

in the direction of Ulan-Ude - Kjahta - Zakamensk

Investment projects, including:

4306.90

4

1188.96

1686.6

2037

300.5

In 2014, in the "axis of growth" in the direction of Ulan-Ude - Kjahta - Zakamensk planned for implementation 3 investment projects worth $ 3,525,900,000. Rub. (Including the 2014 407 960 000. Rub.). GRP growth from these projects will be 1,686,600,000. Rub., Will create 2,037 new jobs, the annual tax revenue was 300.5 million. Rubles. For the implementation of the above projects will be built 30 infrastructure (including 12 objects of transport, 8 of social, 5 engineering infrastructure, community facilities 5) with total funding in 2014 752 170 000. Rub.

Existing enterprises

1954.90

2

1097.60

135.1

1000

45.8

The planned implementation of investment projects (site)

2352.00

2

91.36

1551.5

1037

254.7

Infrastructure, including:

10277.19

29

761.62

     

Transport infrastructure

9101.15

12

281.54

To provide rural communities year-round links with a network of paved roads will be built 4 entrance to the regional roads length of 16.6 km of roads. Will prostroen 1 bridge length of 6.4 lm, built and rehabilitated 42.4 km of roads of the federal and regional significance. 2 schools will be built on 550 seats, 2 obstetric stations, sports hall, 2 buildings under the branches of the MFC. Begin construction of supporting infrastructure ATK "Kjahta" utilities in Sec. Peter and Paul Fortress, networks for energy supply of land for housing construction, sewage treatment plants in Kyakhta.

Social infrastructure

654.44

8

233.39

Engineering infrastructure

228.47

4

18.77

Utilities

293.12

5

227.92

TOTAL

14584.09

33

1950.58

     

4.

along the road in Ulan-Ude - Turuntaevo - Kurumkan

Investment projects, including:

6306.69

8

1390.00

3911.1

2638

594.8

In 2014, in the "growth axis" along the road Ulan-Ude - Turuntaevo - Kurumkan planned for implementation 8 investment projects (including 5 projects for the creation of tourism infrastructure TRZ "Baikal harbor") worth $ 6,055,390,000. Rub. (Including the 2014 1390.0 million. Rub.). GRP growth from these projects will be 3,911,100,000. Rub., Will create 2,638 new jobs, annual tax revenue will amount to 594.8 million. Rubles. For the implementation of the above projects will be built 18 infrastructure (including 5 of the transport, 5 of the social, 7 engineering infrastructure, public utilities 1) with total funding in 2014, 484.0 million. Rubles.

Existing enterprises

6055.39

7

1350,00

3659.8

2598

583.1

The planned implementation of investment projects (site)

251,30

1

40.00

251.3

40

11.7

Infrastructure, including:

31454.73

18

1063.06

     

Transport infrastructure

116,43

7

628.42

2 will be reconstructed bridge crossings and 101 km of regional roads, built staircase to the road of regional significance 2km long, bypass road is 2 km long. Will be built sports center and sports complex, educational and recreational center, renovated building at branch MFC built facilities engineering and support infrastructure of the SEZ "Baikal harbor" power supply for land for housing, reconstruction of boiler house and heating systems.

Social infrastructure

935.74

4

312.74

Engineering infrastructure

30399.72

6

119.06

Utilities

2.84

1

2.84

TOTAL

37761.42

26

2453.06

     

5.

along the highway Ulan-Ude - Bagdarin

Investment projects, including:

123,334.40

3

1328.70

10009.4

4404

3634.2

In 2014, in the "growth axis" along the road Ulan Bagdarin planned for implementation 3 investment projects worth $ 123,334,400,000. Rub. (Including the 2014 2371700000. Rub.).Annual contributions to the GRP from the implementation of these projects is 10009400000. Rub., Will create 4404 new jobs, annual tax revenue will amount to 3,634,200,000. Rub . For the implementation of the above projects will be built 23 of the infrastructure (including 10 transport infrastructure, social facilities 7, 5 of the engineering infrastructure, to 1 for safety) with total funding in 2014 76.84 million. Rubles.

Existing enterprises

116,382.40

2

1322.70

9654.7

3804

3500

The planned implementation of investment projects (site)

6952.00

1

6.00

354.7

600

134.2

Infrastructure, including:

145.54

23

76.84

     

Transport infrastructure

124.59

10

62.72

Will be built one bridge length of 12 lm, re-1 bridge, 2 entrance to the regional roads 8 km long, 6 km of roads reconstructed, 3 specialized site weight control. Will be built 2 paramedic akusherstkih points, 2 gyms and remodeled 1 gym, renovated building at branch MFC and Farmhouse Culture. Will be constructed intra mains for individual housing construction, the building is constructed Investigation Department of the RF IC RB.

Social infrastructure

14.50

7

7.68

Engineering infrastructure

6.34

5

6.34

Security

0.11

1

0.11

TOTAL

123,479.94

26

1405.54

     

6.

Tarbagatajsky area, and Muhorshibirskogo Bichursky areas

Investment projects, including:

9558.17

6

818.60

3142.95

861

662.7

In 2014, in the area of Tarbagatai, Muhorshibirskogo Bichursky and areas planned for implementation 6 investment projects worth $ 9,558,170,000. Rub. (Including the 2014 818 600 000. Rub.). Annual contribution to the GRP from the implementation of these projects will be 3,142,950,000. Rub., Will create 861 new jobs, the annual tax revenue was 662.7 million. Rubles. For the implementation of the above projects will be built 14 infrastructure (including 6 of the transport, 5 of the social, 2 objects of engineering infrastructure, 1 to Water Resources) with total funding in 2014 572 160 000. Rub.

Existing enterprises

9427.57

4

818.60

3045

806

619.4

Investment areas

130.60

2

0.00

97.95

55

43.3

Infrastructure, including:

4403.95

14

572.16

     

Transport infrastructure

4197.16

6

458.69

Will be built and rehabilitated 26.3 km of roads, will begin reconstruction of the overpass. Will be built district cultural, medical and obstetric point reconstructed office of a general practitioner, a kindergarten. Constructed intra mains for individual housing construction, engineering infrastructure for kindergarten, measures were taken to protect engineering from being swamped by the river.Selenga.

Social infrastructure

69.60

5

64.78

Engineering infrastructure

5.70

2

5.70

Water management and environmental protection

131.50

1

43.00

TOTAL

13962.12

20

1390.76

     

7.

towards Sludyanka - Arshan - Orlik

Investment projects, including:

3159.52

2

515.70

281

1500

284.78

In 2014, in the East Sayan area investment plan to implement two investment projects, worth $ 3,159,520,000. Rub. (Including the 2014 313 400 000. Rub.). Annual contributions to the GRP from the implementation of this project will be 281.0 million. Rubles., Will create 1,550 new jobs, the annual tax amount postupelniya 284,780,000. Rub .For investment projects will be built 10 infrastructure (including transport 4 objects, 3 objects of social, - engineering infrastructure and 2 - Water Resources and Environment) with total funding in 2014 546 860 000. Rub.

Existing enterprises

3159.52

2

515.70

281

1500

284.78

Infrastructure, including:

2353.50

10

404.16

     

Transport infrastructure

2017.78

4

60.88

Planned reconstruction of 1.98 km and construction of 11.83 km of roads, the entrance to the highway, the construction of one kindergarten for 100 places, 1 school with 100 seats and room for a branch in amulti-purpose center. Kyren, continue construction of engineering infrastructure ATK "Tunkinsky" fire-chemical stations and one administrative and museum complex.

Social infrastructure

64.17

3

128.43

Engineering infrastructure

171.65

1

171.65

Water management and environmental protection

99.90

2

43.20

TOTAL

5513.02

12

919.86

     

8.

large urban agglomerations "Ulan-Ude"

Investment projects, including:

65421.50

14

4844.59

61148.11

2188

9837.8

In 2014 vgorodskoy agglomeration "Ulan-Ude" sold 9 and planned to implement two investment projects with a total value of 64,905,500,000. Rub.(Including the 2014 4328590000. Rub.) Annual contribution to the GRP from the implementation of these projects will be 61.1 billion. Rubles., Will create 2,188 new jobs, annual tax revenue will amount to 9,837,800,000. Rub.For the implementation of the above projects will be built 26 infrastructure (including transport to 1, 21 to social infrastructure, 1 to municipal, 2 water conservancy facilities and protection okurzhayuschey Wednesday, 1 to security) with total funding in 2014, 4239, 96 million. rubles.

Existing enterprises

40121.50

12

4444.59

37116

1978

5214.9

The planned implementation of investment projects

25300.00

2

400.00

24032.11

210

4622.9

Infrastructure, including:

22030.59

26

4239.96

     

Transport infrastructure

4970.00

1

350.00

Planned reconstruction of the paved runway airport of Ulan-Ude. Will be built 3 kindergartens for 840 seats, 1 school with 400 seats and remodeled 1 school, remodeled 3 theaters. Begin construction of perinatal center in Ulan-Ude, continue construction of the Children's Hospital with 100 beds, the national center for the prevention and control of AIDS and other infectious diseases, reconstruction and development of the Republican Hospital. NASemashko, Oncology Center. The construction of a residential house for orphans and children left without parental care, building boarding houses for 200 people. Events dedicated to the celebration of the 350th anniversary of the city of Ulan-Ude. Begin construction of production facilities for processing solid waste in the country, the construction of an industrial building and laboratory-industrial complex combined hydrometeorological station.

Social infrastructure

16987.85

21

3827.24

Utilities

6.27

1

6.27

Water management and environmental protection

61.02

2

51.00

Security

5.45

1

5.45

TOTAL

87452.09

40

9084.55

     
 

TOTAL

Investment projects, including:

242,674.08

50

13037.05

96167.36

20671.00

21134.08

In 2014, in the Republic of Buryatia planned to implement 46 investment projects worth 241.3 billion. Rubles. (Including in 2014 to 12.6 billion. Rub.). GRP growth from these projects will be about 96.0 billion. Rubles., Will create about 20,000 new jobs, annual tax revenue will be about 21.1 billion . rub. For the implementation of the above projects will be built 184 of the infrastructure (including 64 objects of transport, 60 social facilities, 26 of the engineering infrastructure, 3 power facility, 22 community facilities, 7 water conservancy facilities and OSS, 2 objects for security) with a total amount of funding in 2014 8705470000. rub.

Existing enterprises

202,518.18

39

12438.69

66463.80

16772.00

10786.38

The planned implementation of investment projects (site)

40025.30

9

598.36

29605.61

3844.00

10304.40

Investment areas

130.60

2

0.00

97.95

55.00

43.30

Infrastructure, including:

74415.28

183

8882.11

     

Transport infrastructure

21208.89

64

2230.98

40.43 km will be built. roads, reconstruction of about 200.0 km. roads and works on construction and reconstruction of 17 bridges, build 9 entrances to the roads of regional significance, commissioned 3 points of weight control. Planned construction and reconstruction of five schools at 938 sites and 9 kindergartens at 1,450 locations, will be built and completed the reconstruction of 6 buildings for offices MFC built 5 FAPs renovated office 1 GP 6 gyms, sports complex and completed construction of the sports center with. Maksimikha. Planned reconstruction of the paved runway airport of Ulan-Ude. 3 will be reconstructed theater. Begin construction of perinatal center in Ulan-Ude, continue construction of the Children's Hospital with 100 beds, the national center for the prevention and control of AIDS and other infectious diseases, reconstruction and development of the Republican Hospital. NA Semashko, Oncology Center. The construction of a residential house for orphans and children left without parental care, building boarding houses for 200 people. Begin construction of production facilities for processing solid waste in the country, will continue the construction of engineering and support infrastructure ATK "Kjahta", "Baikal" and "Tunkinskaya valley" TRK "Podlemorye", construction of industrial buildings and laboratory and industrial complex of the combined hydro-meteorological station. Will be constructed intra mains for individual housing construction. Events will begin on bank p. Selenga and lake. Baikal, and continue the reconstruction of 2 irrigation systems.

Social infrastructure

19275.92

60

4891.57

Electric Power

278,05

3

287,19

Utilities

2193.23

22

813.65

Engineering infrastructure

30848.88

25

358.52

Water management and environmental protection

604.74

7

294.64

Security

5.57

2

5.56

TOTAL

317,089.36

233

21919.16

     

 

Reference: The Investment Strategy of the Republic of Buryatia to 2020 was approved in 2014. It is built on the 8 "axes of growth", which have been isolated due to physical and geographical features, as well as historically developed type of settlement of the territory of the republic, which led to development of the territory along the main highways, power lines, and the concentration in the area of these axes most of the population . That is the strategic direction of investment development of geographically localized in areas where historically the intra-industrial production and agricultural complexes to form a vector of development of transport and energy infrastructure to the prospective resource bases.