General information

  • Initiator of the project: Fund for Regional Development of the Republic of Buryatia
  • Сontact person: Vladimir Boldorov
  • Telephone/Fax: +7 301 2 21-11-49, +7 301 2 21-11-50, +7 301 2 21-11-51 
  • E-mail: info@frr-rb.ru

Basic details of the project

Necessary investments: 700 million rubles

Area, ha: 4000 ha

Land category: Agricultural lands

Possibility of extension: available

Fence availability: not available

Relief: smooth

Soil type: Sandy loam soil medium quality

Ground water level, m: about  15 meters

Frost line, m: about 3 meters

The possibility of flooding during the floods: no

Electric energy: HV line 10 kW at 6 km

Highways: Soil road

Railway: not available

Networks, Telecommunications: mobile communications

Type of the site: Agricultural site

Location in the territory of going concern: no

The distance to a highway, km: the distance to the federal highway P-258 "Baikal" - 45 km

The distance to a railway station, km: 135 km

The distance to an airport, km: 135 km

The distance to the nearest residential area, km: 20 km

Labor recources: Tsolga village – 962, Ust-Altasha village – 231.