Construction of greenhouse complex in Gusinoozyorsk city with an area 3,6 ha

General information

  • Initiator of the project: Fund for Regional Development of the Republic of Buryatia
  • Сontact person: Vladimir Boldorov
  • Telephone/Fax: +7 301 2 21-11-49, +7 301 2 21-11-50, +7 301 2 21-11-51 
  • E-mail: info@frr-rb.ru

Passport of investment site for the construction of greenhouse complex in Gusinoozyorsk city with an area 3,6 ha

1. General information

Type of the site (short description)

Agricultural site

Cadastral number (in the presence of cadastral number a copy of the cadastral passport is accompanied). In the absence of cadastral number indicates the cost of cadastral works in respect of the land, designed according with the Calculation methodology the cost of cadastral works in respect of lands for investment sites, approved by the Decree of the Government of the Republic of Buryatia of 08.10.2010 N 438

03:22:010801:152

  Name, address of the owner (the initiator of the project)

Municipal formation "Selenginskiy District"

Ownership form of land and buildings (ownership, lease, other)      

ownership

 

Post

Chairman of the Economic Development Committee of the Municipal formation administration "Selenginskiy District"

Telephone

  8(30145) 41291

Fax

   8(30145) 41291

E-mail

selgus@mail.ru

Availability of business plan

In the pipeline

Availability of techno-economic justification

not available

 

2. Basic details of the project (projects)

Basic details of the project (projects) (goal, short description, product characteristic, lead time, cooperation conditions with perspective investors):

Construction of year-round greenhouse complex with an area of 1 ha in Gusinoozyorsk city of the Selenginskiy district. Greenhouse frame is supposed to be put by the Dutch type - under the glass, complete with a small-volume hydroponics.

The lead time of the project -2015-2017

Marketing (market characteristics, current and anticipated prices, the competitiveness of products):

The largest import segment of the Republic of Buryatia - vegetables, which were imported in the republic in the amount of 14.1 thousand tons at the end of 2013, while the main part accounts for the supplies of tomatoes (16.2%), onions (22.8%), cucumbers ( 9.0%), potato (23.6%). According to the Siberian Customs Department and Rosselkhoznadzor for the Irkutsk region and the Republic of Buryatia, the main suppliers of vegetables in the Republic are China and Mongolia.

Taking into account the dynamics of import of vegetables, one can state the fact that the republic lacks annually about 2.6 thousand tons of tomatoes, 1.2 thousand tons of cucumbers. However, all these kinds of vegetables can be produced in the territory of the republic.

The production of the greenhouse complex is planned to be realized in the Republic of Buryatia through the trade networks "Titan", "Absolut", as well as through the own retail outlets in Ulan-Ude city and Gusinoozyorsk city. Production of the greenhouse complex is in demand, demand exceeds supplies in the market for ecologically cleanvegetables. Prices will vary depending on the season, then the initiator plans to make them less by 20-25% as compared to import production of vegetables coming mainly from PRC. The competitiveness of products is assessed as high, as most buyers began to buy local, ecologically cleanproducts.

Enterprise capacity (the planned volume production, the technology, the expected technical and economic indicators):

Minimum planned productive capacity of the complex - 400 tons of vegetables per year (cucumbers and tomatoes).

Providing an enterprise with resources (the volume of natural, water, energy and other resources, the sources of their receipt):

The land with an area of 3.6 ha, with the possibility of connection to electric energy, water supply, heating, canalization, effluent facilities.

Environmental characteristics of the enterprise (the anticipated volume of emissions and effluents, their composition etc.)

The project complies with environmental requirements, volume of emissions complies with regulations. The environmental project expertise will be carried out if necessary. 

Financing of the project (projects) (amounts and sources of investment, investment efficiency):

The project cost - 50 mln. rub.

3. Location of the site

Address of the site (description)        : 

Location in the territory of going concern (Yes / No, If "yes", then the name of the concern):no

Within the inhabited locality(the inhabited locality name):Gusinoozyorsk city

The distance to a highway, km:From the federal highway M-165 - 5 km.

The distance to a railway station, km:From st. Zagustay - 1 km.

The distance to an airport, km:Airport "Baikal" Ulan-Ude city - 100 km.

Nearest industrial facilities (industrial, agricultural and other) and distance to the facilities (km):branch "Gusinoozerskaya regional hydro-electric power plant" OJSC "INTER RAO - Power generation " - 0.6 km

The distance to the nearest residential area, km:0,8 km

4. Characteristics of the site

Area, ha:3,6

Land category(type of permitted use):Lands of the inhabited localities

Possibility of extension:available

Fenceavailability(yes, no):not available

Relief (smooth terrain, sloping,terraced, benched):smooth

5. Site infrastructure

Resource-Units ofmeasure-Distance from the source area, m

 Watersupply-cub. m/year-400m

Electricenergy-kW-200m

Heating-     Mkcal/hr-500m

Canalization-cub. m/year-400m

Effluentfacility-cub. m/year-700m

6. Communicationonthesite

Highways (type, topping, length etc.):The exit from the road Ulan-Ude - Kyakhta to the land on the Stroitelnaya street, then the left flap to the Zheleznodorozhnaya street, then the right flap to the area of "Working siteregional hydro-electric power plant"                     The length - 5 km.

Railway (type, length etc.):no

Networks telecommunications (telephone, internet and other):Mobile communications: operators Megafon, MTS, BWC, Beeline

Wireless network access

8. Labor recources

Population in the Gusinoozyorsk city – 23436 people.

9. Assignment  terms of the site

Lease terms or sales terms (approximate cost):

Ап=Kadastral values. x dif./100=3275,55*3/100=98,26 rubles per year.

10. Explanatory note to the passport of investment site

Investment project, planned for implementation in this investment site, envisages the construction of a greenhouse complex, complete with modern high-tech equipment for growing vegetables by the small-volume hydroponics method, with an output of 400 tons of vegetables per year.

The investment project realization will allow to provide the ecologically cleanvegetables for the Republic of Buryatia, to create new jobs.

The investment site for the construction of the greenhouse complex in Gusinoozyorsk city of the Selenginskiy District of the Republic of Buryatia with an area of 3,6 ha is located on the lands of inhabited localities within the boundaries of cadastral quarters 03:22:010801:152. The location of the investment site is caused by the presence of the necessary resources:

the presence of the point of connection to the water supply, heating, canalization at a distance of 500 m, the availability of the effluent facilities at a distance of 700 m from the site; and the availability of sufficientlabor recources in the nearest inhabited locality Gusinoozyorsk city, with the number of 23436 inhabitants.

- the availability of sufficient area of land for the investment project realization, with the possibility of extension;

- transport accessibility and high efficiency of the logistics: 5 km from the federal highway, 1 km from the railway station;

- the availability of power lines at a distance of 200 m from the source;

- the presence of the point of connection to the water supply, heating, canalization at a distance of 500 m;

-the availability of the effluent facilities at a distance of 700 m from the source;

- the absence of a residential consruction at a distance of 800 m;

   - the availability of sufficientlabor recources in the nearest inhabited locality Gusinoozyorsk city, with the number of 23436 inhabitants.