Construction of the cement plant

General information

  • Initiator of the project: Fund for Regional Development of the Republic of Buryatia
  • Telephone/Fax: +7 301 2 21-11-49, +7 301 2 21-11-50, +7 301 2 21-11-51 
  • E-mail: info@frr-rb.ru

 

Basic details of the project

Organization of cement production at existing deposits of limestone with an output of up to 1 mln. tons per year.

Deposits of common mineral resources (limestone, clay loam) in the Dzhidinskiy district of the Republic of Buryatia

Mineral resource

Name of the deposit km/rhumb from the nearest inhabited locality

The area of the deposit, depth of reserves calculation

Approbation of reserves of deposit

Reserves according to TBZ RB

Reserves

Balance

ABC1

C2

Off-balance

ABC1

C2

1

2

5

6

7

8

9

10

Limestone, thousand tons

Barun-Alsagskoe 18 / dm,         Altsak village

44 ha

12 m

22214

-

-

Reserve

22214

 

Barun-Saraguyskoe 18 / dm, Altsak village

 

63932

-

-

Reserve

63392

 

 

Barun-Toreyskoe t / ssz,               Ulzar village

34 ha

60 m

25717

-

-

Reserve

25717

 

Toreyskoe 12/ssz,           Ulzar village

1 ha

7 m

532

-

-

Reserve

525

 

Clay loam, thous.m3

Angarhayskoe 7/yuv, Petropavlovka village

10 ha

3.2 m

146

126

-

131

126

Ichetuyskoe 2,5/zyuz, Dedeichetuy village

10 ha

1 m

64,5

-

-

44

 

Ulentuyskoe 2,5/vsv,           Haratsay village

2 ha

5 m

34

-

-

34

 

 

The basic conditions required for construction and operation of the plant

  1. The amount of investment 1.3 billion rubles
  2. Requirements to the reserves of the deposit:

- Limestones (category A + B + C) - 10 800 thousand tons;

- Clay (category A + B + C) - 1 200 thousand tons;

2. The area of the plant– 6 ha.

3. Electricity supply:

- installed capacity– 10 МW;

- required capacity – 54000 MWh.

4. Water supply:

- household and industrial water demand – 80 m3/day;

- compressed air – 50 n m3/min.

5. Transportation:

limestone transportation -          540 thousand tons;

clay – 120 thous.m3 t.;

gypsum – 33600 thousand tons;

fuel– 75,6 thousand tons;

cement – 400 thousand tons;

other materials – 32 thousand tons.

6.  The number of production staff (administrative and managerial staff, employees, production workers) - 135 people.