Auto-tourist cluster "Tunkinskaya valley"

General information

  • Initiator of the project: Fund for Regional Development of the Republic of Buryatia
  • Сontact person: Andrey Torgashin
  • Telephone/Fax: +7 301 2 21-11-49, +7 301 2 21-11-50, +7 301 2 21-11-51 
  • E-mail: info@frr-rb.ru

 

Indicators

 

Total amount of investments

2063,1 million rubles

Including: public investments in facilities of engineering and transport infrastructure

717,1 million rubles

Private investment in tourism facilities

1 346 million rubles

Total area of free sites

11,2 ha

 

Tourist offer:

Medical and health tourism based on thermal waters and mineral springs, SPA-tourism

Mountaineering

Religious tourism

 

 

Location of the sites

Address of the site (description)

in the center of Tunkinskaya valley immediately adjacent to the federal highway A-164 "Kultuk - Mondy", leading from the southern coast of Lake Baikal to the border with Mongolia

Within the inhabited locality (the inhabited locality name)

Zhemchug village

The distance to a highway, km

immediately adjacent to the federal highway A-164 "Kultuk - Mondy"

The distance to an airport, km

airport of Ulan-Ude city - 497 km,

airport city of Irkutsk city - 203 km

Nearest industrial facilities (industrial, agricultural and other) and distance to the facilities (m or km)

In the surrounding areas: medical-sanitary municipal enterprise "Zhemchuzhina", 10 boarding houses, temporary bath housing, a water park, a business-information center of the State National Park "Tunkinskiy".

The distance to the nearest residential area (m or km)

5 km from Zhemchug village

 

Characteristics of the site

Area, ha

11,2

Land category (type of permitted use)

settlement lands

Possibility of extension

available

Fence availability (yes, no)

not available

Relief (smooth, sloping, terraced, benched)

smooth

Frost line, m

2,5

The possibility of flooding during the floods

no

 

Infrastructure

Resource

Availability

Units of measure

Capacity

Distance from the source area, m

The possibility of expansion (the maximum value)

The possibility of periodic shutdown

Watersupply

project

cub. m/year

total water extraction

by ATC         730-1250 m3/day

 

350-400

 

yes

 

no

Electricenergy

project

kW

900 kW / hour

 

3 TS 2х630 at the border of the site

no

no

Canalization

project

cub. m

Estimated flow by ATC        486,0 m3/day

self-flowing and pressure sewers at the border of the site

 

 

Effluent  facility

project

cub. m

Capacity of facilities          500-2000 m3/day

2000

no

no

 

Communication on the site

Highways (type, topping, length etc.)

no

Railway (type, topping, length etc.)

no

Networks telecommunications (telephone, internet and other)

no

 

Labor recources

Inhabited locality

Distance, km

Number

Maliy Zhemchug

Zhemchug

Ohor-Shibir

Ulan-Gorkhon

6

5

5

10

76

1244

588

54

 

Basic details of the project

Development of the ATC will provide an increase of the total capacity of place of accommodation up 1,421 beds and will increase the tourist flow up to 300 thousand tourists a year. For investors are encouraged to implement projects of a road house, a motel, food and objects of roadside service on free sites with total area of 11.2 hectares.