General information

  • Initiator of the project: Fund for Regional Development of the Republic of Buryatia
  • Сontact person: Andrey Torgashin
  • Telephone/Fax: +7 301 2 21-11-49, +7 301 2 21-11-50, +7 301 2 21-11-51 
  • E-mail: info@frr-rb.ru

Location of the sites 

Address of the site (description)       

RB, Kabanskiy district, MF "Suhinskoe", 1300 m to the north-west from Zareche village and north-east from Suhaya village.

Description:

Woodland area in the cadastral quarter 03:09:640102, adjacent to the foreshore of LakeBaikal, located on the right bank of the creek Mochishe, north of the complex structures on the right side of the projected haven.

Location in the territory of going concern (Yes / No, If "yes", then the name of the concern)

Tourist family pensionate IP Rabzhueva, guest house "Tengeri" IP Rinchinova, building tourist complex "Sagan Morin".

Within the inhabited locality (the inhabited locality name)

Zareche village, Suhaya village.

The distance to a highway, km

10 km (field road)

80 km

The distance to a railway station, km

Selenga station, 81 km

The distance to an airport, km

Ulan-Ude airport - 186 km,

Irkutsk airport  - 430 km

Nearest industrial facilities (industrial, agricultural and other) and distance to the facilities (m or km)

-

The distance to the nearest residential area (m or km)

private residential sector Zareche village - 1300 m

 

Characteristics of the site

Area, ha

1,6277

 

Land category (type of permitted use)

Agricultural lands, type of land – pasture

 

Possibility of extension

not available

Fence availability (yes, no)

not available

Relief (smooth, sloping, terraced, benched)

smooth

Soil type, seismicity

clay loam

Ground water level, m

3,5

Frost line, m

2,5

The possibility of flooding during the floods

no

 

Infrastructure

Resource

Availability

Units of measure

Capacity

Distance from the source area, m

The possibility of expansion (the maximum value)

The possibility of periodic shutdown

 Watersupply

since 2014

cub. m/year

total water extraction up to 900 m3 / day

 

2,5 km

no

no

Electricenergy

since 2013

kW

6880

7,5 km

no

no

Heating

no

Mkcal/hr

-

-

-

no

Canalization

since 2014

cub. m/year

292.0

m3 / day

250 m

no

no

Gas

no

cub. m/year

-

-

-

-

Steam

no

bar

-

-

-

-

Effluent  facility

since 2014

cub. m/year

total acceptance 500 m3 / day

4 km

no

no

Compressedair

no

cub. m/month

-

-

-

-

 

Communication on the site

Highways (type, topping, length etc.)

field road

Railway (type, topping, length etc.)

no

Networks telecommunications (telephone, internet and other)

nearest connection point to the Rostelecom network - 1300 m

 

Labor recources

(The population of the nearest inhabited localities)

Inhabited locality

 

Distance 

Number

Zareche village

Novyi Enhaluk village

Suhaya village

100 m

20 km

4 km

335   /   212

173   /   111

546   /   347

  

Assignment terms of the site

Lease. Terms and conditions: timely payment, the intended use and performance of the obligations under the contract. Transfer of ownership in virtue of project realization of construction of the object of tourism and recreation in accordance with the approved plan project TRC "Podlemorye "

 

Situational plan of the territory